Well I guess I trouble shot network cabling issues a long time ago. Does that count?You know a fair bit about this if it is the case. To re-wire the whole thing how long could you see it taking?
From what I saw then, proper cabling guys are very tidy - creating works of art and it is a shame when you have to cut their cable ties and disturb patterns to move something. It is not in their nature to sabotage - I'm sure the original cabling looked lovely and tested OK.
But we are now told the circuits failed.
I'm more throwing ideas out there, in the hope that someone who knows more can confirm or shred the theories - I'm OK either way.
It just seems to me that the only thing that would have changed between the circuits working and failing - remembering that they are amongst the last things to be installed - is the stadium being powered up.
I just suggest the fire wires were too close the AC lines powering the cheesery paddles, aircon, etc.
Of course the snippets we are told could be wrong, but if we dismiss it all, there is nothing to write about.