Re the discussion about the NFL and signage etc.
The East Stand is the Main Entrance for the NFL and not that on the High Rd, so I don’t know if that will make any difference overall. I don’t really know what is meant here by a clean stadium as I imagine that all the different NFL stadiums have...
The roof won't be up this November. In the last meeting between Club and THST, Levy responded in answer to a question, that a good indicator if the stadium is on time is that of the roof going on in January or February and is to take about 12 weeks to complete.
As an aside the construction of...
Most of the demolition will be conducted from the inside of the stadium because of space restrictions to the north, south and east, but to get the big beast chomping machines into the stadium they need a dirty great big hole in the west stand to drive thru and with the removal of Spurs shop...
The has been some internet controversy (especially on SSC) over the revised cost of the new stadium as quoted at £800m. I went straight to the horse's mouth so to speak and asked Donna Cullen via email.
My email and her reply received today 7 March, are quoted below.
The revised would seem to...
Hi The Scarecrow, does this help at all)
e main roof surface is an aluminium standing seam cladding system supported on a structural trapezoidal deck supported by purlins spanning between the main steel ra ers which are supported by the cable net.
e area of the main roof surface has a...
Re the seating for us plebs go to page 3 of 10 of the link below
http://www.planningservices.haringey.gov.uk/portal/servlets/AttachmentShowServlet?ImageName=748453
I doubt we would have had snythingblikevthst approved. The English Heritage and especially CABE were dead set against the designs of the first two submitted plans as they messed up the historic and architectural line of the High Rd conservation area, and not in keeping with a dense urban area...
It's a service gantry in the north stand 'roof' to provide access between West and East stand sky lounges, the spectator seating for them is at the front of top level stand.
The north stand gantry would not give a good view and there are no sanitary services supplied there.
Could be used for...
Core 6 to be started soon
From official site
In order that construction works can continue according to timetable we need to install one of the six vertical concrete cores, which stabilise the new stadium structure, in this corner. This core is the only one that sits inside the footprint of the...
No all to go except Warmington House. Lower facade of Dispensary to be incorporated into the museum as is various architectural bits of the Red House including the panels and window from old board room.
That's the gap between the original stand and the temp Seating that is covering the running track. I assume they slide back to or into the main stand when in athletics mode. The 'black' isn't a hole or void, just the back facade of the temp seats otherwise you would see all the gubnings so -...
Yes,that's right. Those documents are the basis and reports which discharged our responsibility and so permission has been been granted to demolish. We now just have to take out, store, certain items before wrecking ball can commence.
A reminder to those browsing without an account, it's quick and easy to Register Here. Come and join the fun!
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.